Electrical bids go wrong in the details nobody puts on the cover sheet. A panel schedule that quietly shifts from 200 amps to 400. A feeder that extends 80 feet because the architect shifted the electrical room. The copper that went up by 12 percent between the bid and PO date. This is the purpose […]